ExCel London

The Exhibition Centre London is currently undergoing phase 3, a 25,000sqm expansion programme. This will include a state of the art convention centre, exhibition space to ground floor, conference rooms and public green spaces. The scheme will be a Net Zero carbon ready building, utilising 50% recycled steel, targeting BREEAM excellence, with sustainability solutions.

We are interfacing with live exhibitions and the live building site to provide a separating wall to protect the public area from the building works, to three levels of the centre.

A scaffold frame triple guardrail to barge perimeter. HAKI system stairs, beamed cantilever and independent scaffolds, birdcage type scaffold in the basement voids. Leading edge protection to various areas to prevent falls from height and segregation. Lift shafts and loading bays alongside the customary built scaffolds and supplying extra toe boards and handrails for the Heras fencing.